Dholera Special Investment Region

Also known as Dholera SIR or Dholera Smart City

For the semiconductor project see Dholera semiconductor fab. For the plan see master plan.
Dholera Special Investment Region
TypeGreenfield industrial smart city / Special Investment Region
LocationAhmedabad district, Gulf of Khambhat, Gujarat, India
Distance~100 km south-west of Ahmedabad
Planned area~920 sq km (~422 sq km urban)
Legal basisGujarat Special Investment Region Act, 2009
AuthoritiesDSIRDA (planning); DICDL (SPV)
CorridorDelhi-Mumbai Industrial Corridor (flagship node)
AnchorTata Electronics semiconductor fab, Rs 91,000 cr

The Dholera Special Investment Region (Dholera SIR), marketed as Dholera Smart City, is a greenfield industrial planned city on the western coast of the Gulf of Khambhat in Ahmedabad district, Gujarat, about 100 km south-west of Ahmedabad. It is the flagship, and often the largest-cited, node of the Delhi-Mumbai Industrial Corridor. Dholera SIR is planned over about 920 sq km, of which roughly 580 sq km is developable and about 422 sq km is designated for urban development across six town-planning schemes (TP1 to TP6). Around one-third of the developable land falls in the Coastal Regulation Zone.

Dholera SIR is established under the Gujarat Special Investment Region Act, 2009, which lets the state designate and regulate large investment regions. The region is governed by the DSIRDA (the statutory planning and land authority) and built by DICDL, a special purpose vehicle incorporated on 28 January 2016 and held 51% by the Gujarat government and 49% by the central government through the NICDC Trust. The Gujarat Infrastructure Development Board acts as the apex body and NICDC is the central nodal agency.

Master plan and phasing

Development is phased over roughly three decades: Phase I (TP1 and TP2, 153 sq km) holds the 22.5 sq km Activation Area; Phase II (TP3 and TP4, 126 sq km) runs to about 2032; Phase III (TP5 and TP6, 142 sq km) runs to about 2042. The Activation Area of about 22.5 sq km sits inside TP Scheme 2 and is the phase-1 plug-and-play zone where trunk infrastructure is reported complete. The Government of India approved infrastructure tender packages of Rs 2,784.83 crore for it, and matching equity of the same amount has been released.

Economy and anchors

The anchor industrial investment is the Tata Electronics semiconductor fab, approved by the Union Cabinet on 29 February 2024 under the India Semiconductor Mission, a Rs 91,000 crore facility built with Taiwan's PSMC for up to 50,000 wafers a month on a 300mm line. At full build-out the SIR-wide employment figure stated by DICDL is more than 8 lakh jobs, a planning target rather than a current total. The planned industrial area is about 11,000 hectares, split into clusters, with sectors spanning electronics, pharma, heavy engineering, auto, general manufacturing, agro-processing and, more recently, data centres.

Honest status

Land acquisition for the SIR was litigated in the 2010s, and delivery has run over a long timeline with repeatedly slipping targets, particularly for the airport. The counter to "nothing is happening" is that documented anchors now exist: the Tata fab under construction, ~300 MW of solar commissioned, an operational expressway and completed Activation-Area trunk infrastructure. No government source guarantees appreciation, and assured-return claims are marketing rather than fact.

This article follows Dholerapedia's sourcing standard: every figure is tagged Confirmed (government or official), Reported (press or trade) or Unverified (broker), and dated. Anything framed as a future event is labelled a target until a government source confirms it. Where a fact is not reliably available, we say so rather than estimate. See the methodology.

Key facts

The core facts for dholera special investment region are summarised below; each is drawn from the sources listed at the foot of this article and dated to the review month.

Context

Dholera SIR is planned over about 920 sq km, of which roughly 422 sq km is designated for urban development across six town-planning schemes phased over about three decades. It is governed by the DSIRDA (planning authority) and built by DICDL, a special purpose vehicle held 51% by Gujarat and 49% by the central government through the NICDC Trust, and it is the flagship node of the Delhi-Mumbai Industrial Corridor. This context frames every article on the region; the specifics of this topic are covered above, and the full picture is in What is Dholera SIR and the master plan.

Reading this reference

Dholerapedia is a reference, so it is built to be checked rather than believed. Every figure in this article is tagged by source, Confirmed for a government or official record, Reported for press or trade coverage, and Unverified for a broker claim, and each carries a date because Dholera changes and a number that was right last year may not hold now. Anything described as a future event is treated as a target until a government source confirms it, and where a fact is not reliably available the article says so instead of guessing. None of this is investment, legal or tax advice, and no government source guarantees appreciation. If you are evaluating a specific plot, the figures here are context, not a substitute for confirming that parcel's GUJRERA registration, title and price yourself. Corrections that improve accuracy are welcome via the contact page, and entries are updated as official figures change rather than left stale. The reason for this standard is simple: a reference is only worth reading if you can act on it and check it, so we would rather show a smaller number of well-sourced facts than a larger number of impressive-sounding ones. Where a claim about Dholera circulates widely but rests only on a broker source, we note it as unverified rather than repeat it as settled, and where the official record and the marketing disagree, we follow the official record. For the collected figures across the encyclopedia, see Dholera in numbers, and for the full method see the methodology.

References

  1. NICDC Delivery Monitoring Unit report, 30 June 2026 (DPIIT).
  2. DSIRDA Sanctioned Development Plan (project profile).
  3. Dholera Industrial City Development Ltd, dholera.gujarat.gov.in/about_us.
  4. Press Information Bureau, Release ID 2260624, 13 May 2026.