Home › Dholera mega-projects

Dholera mega-projects

Dholera's profile rests on a set of mega-projects, each with its own article separating confirmed facts from announced targets. The anchor industrial investment is the Tata Electronics semiconductor fab, approved by the Union Cabinet on 29 February 2024 under the India Semiconductor Mission, a Rs 91,000 crore facility built with Taiwan's PSMC for up to 50,000 wafers a month on a 300mm line.

The projects

Semiconductor fab: Rs 91,000 crore, under construction. Airport: reported ~80%, targeted late 2026. Expressway: reported operational. Semi high-speed rail: approved 2026, targeted 2030-31. Solar park: ~300 MW commissioned of a 1,000 MW phase one.

How to read them

Approvals, investment and capacity are durable facts; dates are targets and move. No government source guarantees appreciation, and assured-return claims are marketing rather than fact.

This article follows Dholerapedia's sourcing standard: every figure is tagged Confirmed (government or official), Reported (press or trade) or Unverified (broker), and dated. Anything framed as a future event is labelled a target until a government source confirms it. Where a fact is not reliably available, we say so rather than estimate. See the methodology.

About Dholera SIR

Dholera SIR is planned over about 920 sq km, of which roughly 580 sq km is developable and about 422 sq km is designated for urban development across six town-planning schemes (TP1 to TP6). Around one-third of the developable land falls in the Coastal Regulation Zone. The region is governed by the DSIRDA (the statutory planning and land authority) and built by DICDL, a special purpose vehicle incorporated on 28 January 2016 and held 51% by the Gujarat government and 49% by the central government through the NICDC Trust.

About Dholera SIR

Dholera SIR is planned over about 920 sq km, of which roughly 580 sq km is developable and about 422 sq km is designated for urban development across six town-planning schemes (TP1 to TP6). Around one-third of the developable land falls in the Coastal Regulation Zone. The region is governed by the DSIRDA (the statutory planning and land authority) and built by DICDL, a special purpose vehicle incorporated on 28 January 2016 and held 51% by the Gujarat government and 49% by the central government through the NICDC Trust. Development is phased over roughly three decades: Phase I (TP1 and TP2, 153 sq km) holds the 22.5 sq km Activation Area; Phase II (TP3 and TP4, 126 sq km) runs to about 2032; Phase III (TP5 and TP6, 142 sq km) runs to about 2042.

How Dholerapedia is sourced

Dholerapedia is a reference, so it is built to be checked rather than believed. Every figure in this article is tagged by source, Confirmed for a government or official record, Reported for press or trade coverage, and Unverified for a broker claim, and each carries a date because Dholera changes and a number that was right last year may not hold now. Anything described as a future event is treated as a target until a government source confirms it, and where a fact is not reliably available the article says so instead of guessing. None of this is investment, legal or tax advice, and no government source guarantees appreciation. If you are evaluating a specific plot, the figures here are context, not a substitute for confirming that parcel's GUJRERA registration, title and price yourself. Corrections that improve accuracy are welcome via the contact page, and entries are updated as official figures change rather than left stale. The reason for this standard is simple: a reference is only worth reading if you can act on it and check it, so we would rather show a smaller number of well-sourced facts than a larger number of impressive-sounding ones. Where a claim about Dholera circulates widely but rests only on a broker source, we note it as unverified rather than repeat it as settled, and where the official record and the marketing disagree, we follow the official record. For the collected figures across the encyclopedia, see Dholera in numbers, and for the full method see the methodology.

Explore

All articles · What is Dholera SIR · Dholera in numbers · Mega-projects · Glossary · Methodology