Dholera rail connectivity

Semi high-speed rail and freight links

Dholera rail connectivity
Semi high-speed railRs 20,667 cr, 134 km
ApprovedCCEA, 13 May 2026
Target2030-31
FreightBhimnath-Dholera line approved 2021

Dholera rail connectivity centres on a semi high-speed line to Ahmedabad and a proposed freight link.

Semi high-speed rail

The CCEA approved the Ahmedabad (Sarkhej)-Dholera Semi High-Speed Double Line on 13 May 2026 at about Rs 20,667 crore, adding roughly 134 km, described as India's first semi high-speed rail using indigenous technology, and targeted for completion by 2030-31 (PIB Release 2260624). A widely quoted 220 km/h design speed is press-sourced; the PIB release states cost, length and timeline, not a speed. Confirmed

Freight

A Bhimnath-Dholera freight rail line was approved by the NICDIT board on 21 September 2021, connecting the SIR toward the Western Dedicated Freight Corridor. Confirmed

This article follows Dholerapedia's sourcing standard: every figure is tagged Confirmed (government or official), Reported (press or trade) or Unverified (broker), and dated. Anything framed as a future event is labelled a target until a government source confirms it. Where a fact is not reliably available, we say so rather than estimate. See the methodology.

Key facts

The core facts for dholera rail connectivity are summarised below; each is drawn from the sources listed at the foot of this article and dated to the review month.

Context

Dholera SIR is planned over about 920 sq km, of which roughly 422 sq km is designated for urban development across six town-planning schemes phased over about three decades. It is governed by the DSIRDA (planning authority) and built by DICDL, a special purpose vehicle held 51% by Gujarat and 49% by the central government through the NICDC Trust, and it is the flagship node of the Delhi-Mumbai Industrial Corridor. This context frames every article on the region; the specifics of this topic are covered above, and the full picture is in What is Dholera SIR and the master plan.

Reading this reference

Dholerapedia is a reference, so it is built to be checked rather than believed. Every figure in this article is tagged by source, Confirmed for a government or official record, Reported for press or trade coverage, and Unverified for a broker claim, and each carries a date because Dholera changes and a number that was right last year may not hold now. Anything described as a future event is treated as a target until a government source confirms it, and where a fact is not reliably available the article says so instead of guessing. None of this is investment, legal or tax advice, and no government source guarantees appreciation. If you are evaluating a specific plot, the figures here are context, not a substitute for confirming that parcel's GUJRERA registration, title and price yourself. Corrections that improve accuracy are welcome via the contact page, and entries are updated as official figures change rather than left stale. The reason for this standard is simple: a reference is only worth reading if you can act on it and check it, so we would rather show a smaller number of well-sourced facts than a larger number of impressive-sounding ones. Where a claim about Dholera circulates widely but rests only on a broker source, we note it as unverified rather than repeat it as settled, and where the official record and the marketing disagree, we follow the official record. For the collected figures across the encyclopedia, see Dholera in numbers, and for the full method see the methodology.