Plans for a Metro or MRTS connecting Ahmedabad and Dholera have been reported, with an uncertain current status.

Status

An Ahmedabad-DSIR MRTS (Metro Rail Transit System) was reported approved around January 2021, but its current status is unclear and it likely overlaps with, or has been superseded by, the semi high-speed rail project approved in 2026. There is no confirmed construction of a Dholera metro on the ground, and no operational service, so any claim of a running or under-construction metro should be treated as unverified. For the transit link that is actually approved and funded, see the rail connectivity article; for road access see the expressway. Present any metro claim as reported and unconfirmed rather than as fact. Reported

See also

What is Dholera SIR · Master plan · Current status · Dholera in numbers · Glossary

Context

Dholera SIR is planned over about 920 sq km, of which roughly 422 sq km is designated for urban development across six town-planning schemes phased over about three decades. It is governed by the DSIRDA (planning authority) and built by DICDL, a special purpose vehicle held 51% by Gujarat and 49% by the central government through the NICDC Trust, and it is the flagship node of the Delhi-Mumbai Industrial Corridor. This context frames every article on the region; the specifics of this topic are covered above, and the full picture is in What is Dholera SIR and the master plan.

Reading this reference

Dholerapedia is a reference, so it is built to be checked rather than believed. Every figure in this article is tagged by source, Confirmed for a government or official record, Reported for press or trade coverage, and Unverified for a broker claim, and each carries a date because Dholera changes and a number that was right last year may not hold now. Anything described as a future event is treated as a target until a government source confirms it, and where a fact is not reliably available the article says so instead of guessing. None of this is investment, legal or tax advice, and no government source guarantees appreciation. If you are evaluating a specific plot, the figures here are context, not a substitute for confirming that parcel's GUJRERA registration, title and price yourself. Corrections that improve accuracy are welcome via the contact page, and entries are updated as official figures change rather than left stale. The reason for this standard is simple: a reference is only worth reading if you can act on it and check it, so we would rather show a smaller number of well-sourced facts than a larger number of impressive-sounding ones. Where a claim about Dholera circulates widely but rests only on a broker source, we note it as unverified rather than repeat it as settled, and where the official record and the marketing disagree, we follow the official record. For the collected figures across the encyclopedia, see Dholera in numbers, and for the full method see the methodology.

References

  1. NICDC Delivery Monitoring Unit report, 30 June 2026 (DPIIT).
  2. DSIRDA Sanctioned Development Plan (project profile).
  3. Dholera Industrial City Development Ltd, dholera.gujarat.gov.in/about_us.
  4. Press Information Bureau, Release ID 2260624, 13 May 2026.